S7315s

Home > Products > S7315s

  • S7315s
  • S7315s
S7315s

S7315s

1. 1300 W continuous program power capacity
2. 96dB Sensitivity 1w/1m
3. 39Hz ~1000Hz frequency response range
4. 91mm(3.6") inside/outside copper voice coil
5. FEA designed ferrite magnetic
6. Reinforced CONEX spider for improved linearity control
7. Ideal for compact extended woofer or subwoofer application
DOWNLOAD Product Comparison
Technical Specifications
  • General Specifications
  • Nominal Diameter

    39 Hz
  • Rated Impedance

    8 ohm
  • Nominal Power handling1

    650 Watts
  • Program Power2

    1300 Watts
  • Sensitivity(lw/lm)3

    96 dB
  • Frequency Range4

    39 ~ 1000 Hz
  • Minimum Impedance(Zmin)

    6.8 ohm
  • Voice Coil Diameter

    91/3 mm/inch
  • Voice Coil Material

    Copper
  • Former Material

    Glass Fiber
  • Voice Coil Winding Depth

    25.5 mm
  • Number of layers

    2(inside/outside)
  • Magnet gap depth

    10 mm
  • Basket

    Cast Aluminum
  • Flux Density

    1.1 T
  • Magnet Outer Diameter/Wgt

    200/97 mm/oz
  • Thiele-Small parameters
  • Resonance frequency

    Fs 39 Hz
  • DC resistance

    Re 5.6 ohm
  • Mechanical factor

    Qms 19.5
  • Electrical factor

    Qes 0.43
  • Total factor

    Qts 0.42
  • Mechanical compliance

    Cms 0.12 mm/N
  • Mechanical resistance of suspension losses

    Rms 1.47 kg/s
  • Effective Moving Mass

    Mms 141 m
  • Half-space efficiency

    Eff 1.61 %
  • BL Factor

    BL 21 T.m
  • Equivalent Cas air load

    Vas 120 liters
  • Effective piston area

    Sd 0.0845 m^2
  • Max. linear excursion6

    Xmax ±10.2 mm
  • Voice coil inductance

    Le1K 1.7 mH
  • Efficiency Bandwidth Product

    EBP 90
  • Mounting Information
  • Overall Diameter

    393 mm
  • Bolt Circle Diameter

    375 mm
  • Bolt Hole Diameter

    6.5 mm
  • Baffle Cutout Diameter

    356 mm
  • Overall Depth

    170 mm
  • Net Weight

    8.8 kg
  • Shipping Weight

    9.9 kg
  • Shipping Box

    430x430x205 mm
Technical Specifications
  • LF General Specifications
  • Nominal Diameter

    mm/inch
  • Rated Impedance

    ohm
  • Nominal Power handling1

    Watts
  • Program Power2

    Watts
  • Sensitivity(lw/lm)3

  • Frequency Range4

    Hz
  • Voice Coil Diameter

    mm/inch
  • Voice Coil Material

    Copper
  • Voice Coil Winding Depth

    mm
  • Number of layers

    (inside/outside)
  • Magnet Outer Diameter/Wgt

    mm/oz
  • HF General Specifications
  • Throat Diameter

    mm/inch
  • Rated Impedance

    ohm
  • Power handling(2k~18kHz)

        Nominal2

    Watts
  •     Continuous Porgram3

    Watts
  • Sensitivity3(lw/lm,on axis)

    dB
  • Frequency Range4

    Hz
  • Voice Coil Diameter

    mm/inch
  • Voice Coil Material

    Copper
  • Diaphragm Material

    mm
  • Magnet Material

    kg
  • LF Thiele-small Parameters
  • Resonance frequency

    Fs Hz
  • DC resistance

    Re ohm
  • Mechanical factor

    Qms
  • Electrical factor

    Qes
  • Total factor

    Qts
  • Mechanical compliance

    Cms mm/N
  • Mechanical resistance of suspension losses

    Rms mech-ohm
  • Effective Moving Mass

    Mms g
  • Half-space efficiency

    Eff %
  • BL Factor

    BL T.m
  • Equivalent Cas air load

    Vas liters
  • Effective piston area

    Sd ㎡
  • Max. linear excursion5

    Xmax mm
  • Voice coil inductance

    Le1K mH
  • Efficiency Bandwidth Product

    EBP mH
  • Mounting Information
  • Overall Diameter

    mm
  • Bolt Circle Diameter

    mm
  • Bolt Hole Diameter

    mm
  • Baffle Cutout Diameter

    mm
  • Overall Depth

    mm
  • Net Weight

    kg
  • Shipping Weight

    kg
  • Shipping Box

    mm
Technical Specifications
  • General Specifications
  • Throat Diameter

    mm/inch
  • Rated Impedance

    ohm
  • Power handling

        Nominal2

    Watts
  •     Continuous Porgram3

    Watts
  • Sensitivity4(1w/1m,on axis,on horn)

    dB
  • Frequency Range

    Hz
  • Minimum Impedance(Zmin)

    ohm
  • Voice Coil Diameter

    mm/inch
  • Voice Coil Material

  • Voice Coil Former

  • Phase Plug Material

  • Diaphragm Material

  • Flux Density

    T
  • Magnet Material

  • Mounting Information
  • Overall Diameter

    mm
  • Overall Depth

    mm
  • Net Weight

    kg
  • mounting

    4xM6 holes,90°on 102
Curves

Frequency response measured in a closed enclosure of 600L in an anechoic chamber

images/upfile/S7315s-CURVES.jpg

Computer predicted low frequency response

images/upfile/S7315s-PREDICTED.jpg

Home Products Compare Download Contact Us