M5315s

Home > Products > M5315s

  • M5315s
  • M5315s
  • M5315s
  • M5315s
M5315s

M5315s

1. 1600 W continuous program power capacity
2. 97dB Sensitivity 1w/1m
3. 40Hz ~1000Hz frequency response range
4. 100mm(4") inside/outside copper voice coil
5. Double silicone spiders with optimized compliance
6. Triple-roll cloth edge with deep corrugations for extended Xmax
7. Corrugated cone geometry
8. Ideal for compact bass-reflex subwoofer application
DOWNLOAD Product Comparison
Technical Specifications
  • General Specifications
  • Nominal Diameter

    40 Hz
  • Rated Impedance

    8 ohm
  • Nominal Power handling1

    800 Watts
  • Program Power2

    1600 Watts
  • Sensitivity(lw/lm)3

    97 dB
  • Frequency Range4

    40 ~ 1000 Hz
  • Minimum Impedance(Zmin)

    7.5 ohm
  • Voice Coil Diameter

    100/4 mm/inch
  • Voice Coil Material

    Copper
  • Former Material

    Glass Fiber
  • Voice Coil Winding Depth

    25 mm
  • Number of layers

    2(inside/outside)
  • Magnet gap depth

    12 mm
  • Basket

    Cast Aluminum Cast Aluminum
  • Flux Density

    1.1 T
  • Magnet Outer Diameter/Wgt

    220/125 mm/oz
  • Thiele-Small parameters
  • Resonance frequency

    Fs 40 Hz
  • DC resistance

    Re 5.2 ohm
  • Mechanical factor

    Qms 8.7
  • Electrical factor

    Qes 0.33
  • Total factor

    Qts 0.32
  • Mechanical compliance

    Cms 0.095 mm/N
  • Mechanical resistance of suspension losses

    Rms 4.74 kg/s
  • Effective Moving Mass

    Mms 163 g
  • Half-space efficiency

    Eff 1.81 %
  • BL Factor

    BL 25.4 T.m
  • Equivalent Cas air load

    Vas 95 liters
  • Effective piston area

    Sd 0.0845 m^2
  • Max. linear excursion6

    Xmax ± 9 mm
  • Voice coil inductance

    Le1K 2.0 mH
  • Efficiency Bandwidth Product

    EBP 121
  • Mounting Information
  • Overall Diameter

    393 mm
  • Bolt Circle Diameter

    375 mm
  • Bolt Hole Diameter

    6.5 mm
  • Baffle Cutout Diameter

    356 mm
  • Overall Depth

    179 mm
  • Net Weight

    11.7 kg
  • Shipping Weight

    12.7 kg
  • Shipping Box

    420x420x205 mm
Technical Specifications
  • LF General Specifications
  • Nominal Diameter

    mm/inch
  • Rated Impedance

    ohm
  • Nominal Power handling1

    Watts
  • Program Power2

  • Sensitivity(lw/lm)3

  • Frequency Range4

    Hz
  • Voice Coil Diameter

    mm/inch
  • Voice Coil Material

    Copper
  • Voice Coil Winding Depth

    mm
  • Number of layers

    (inside/outside)
  • Magnet Outer Diameter/Wgt

    mm/oz
  • HF General Specifications
  • Throat Diameter

    mm/inch
  • Rated Impedance

    ohm
  • Power handling(2k~18kHz)

        Nominal2

    Watts
  •     Continuous Porgram3

    Watts
  • Sensitivity3(lw/lm,on axis)

    dB
  • Frequency Range4

    Hz
  • Voice Coil Diameter

    mm/inch
  • Voice Coil Material

    Copper
  • Diaphragm Material

    mm
  • Magnet Material

    kg
  • LF Thiele-small Parameters
  • Resonance frequency

    Fs Hz
  • DC resistance

    Re ohm
  • Mechanical factor

    Qms
  • Electrical factor

    Qes
  • Total factor

    Qts
  • Mechanical compliance

    Cms mm/N
  • Mechanical resistance of suspension losses

    Rms mech-ohm
  • Effective Moving Mass

    Mms g
  • Half-space efficiency

    Eff %
  • BL Factor

    BL T.m
  • Equivalent Cas air load

    Vas liters
  • Effective piston area

    Sd ㎡
  • Max. linear excursion5

    Xmax mm
  • Voice coil inductance

    Le1K mH
  • Efficiency Bandwidth Product

    EBP mH
  • Mounting Information
  • Overall Diameter

    mm
  • Bolt Circle Diameter

    mm
  • Bolt Hole Diameter

    mm
  • Baffle Cutout Diameter

    mm
  • Overall Depth

    mm
  • Net Weight

    kg
  • Shipping Weight

    kg
  • Shipping Box

    mm
Technical Specifications
  • General Specifications
  • Throat Diameter

    mm/inch
  • Rated Impedance

    ohm
  • Power handling

        Nominal2

    Watts
  •     Continuous Porgram3

    Watts
  • Sensitivity4(1w/1m,on axis,on horn)

    dB
  • Frequency Range

    Hz
  • Minimum Impedance(Zmin)

    ohm
  • Voice Coil Diameter

    mm/inch
  • Voice Coil Material

  • Voice Coil Former

  • Phase Plug Material

  • Diaphragm Material

  • Flux Density

    T
  • Magnet Material

  • Mounting Information
  • Overall Diameter

    mm
  • Overall Depth

    mm
  • Net Weight

    kg
  • mounting

    4xM6 holes,90°on 102
Curves

Frequency response measured in a closed enclosure of 600L in an anechoic chamber

images/upfile/M5315s-Curves.jpg

Computer predicted low frequency response

images/upfile/M5315s-PREDICTED.jpg

Home Products Compare Download Contact Us